Call Us Today! 517.680.7950
Live Chat
Menu

Case Study: Cost-Saving Production of Conveyor Subassembly

We Build Trust

Two of the most important tenants of running any business are to control costs and generate cash. So, when one of the parts you need is made overseas and is both expensive and time consuming to purchase and obtain, you work to find an alternate supplier.

A conveyor manufacturer was purchasing a subassembly from a European supplier. Unfortunately, this made the subassembly expensive while also taking a great deal of time to be flown in Europe.

To solve their problem, the manufacturer found Caster Concepts. They sent the plans for the part to the engineering team at Caster Concepts and the new, domestically produced subassemblies were in production.

The subassemblies were designed, manufactured, and delivered in 3 weeks, which was a huge improvement in both cost and time. That’s how you control costs and generate cash.

Quick Contact

We'd Love to hear From You!

Our Family

  • themachinecenter
  • reactionindustries
  • fabricatingconcepts
  • tripleellc
  • albionmachine
  • conceptual-innovations
  • conveyorconcepts
  • larcaster
  • modernsuspensionsystems
  • mhia
  • pjr
  • ISO Certificate
  • michigan